PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued installing duct work at the 3rd floor Facing North-East.jpg Continued installing the underground electrical roughing at the Boiler Room Facing South-West.jpg Equipment rack at the electrical room 470 Facing North-East.jpg Installe the hot water supply and return at the 2nd floor Facing West.jpg Started framing the lower roof-4th floor at the Courtroom 446 Facing North.jpg
Previous page Started framing the lower roof-4th floor at the Courtroom 446 Facing North
Started framing the lower roof-4th floor at the Courtroom 446 Facing North